Fire Water Demand in India: OISD vs IS 13039

Fire water demand is the quantity of water, at the required pressure, that a fire protection system must be able to deliver for the worst-case fire in a facility. Everything else in a fire water system, including pump size, pipe diameters, and storage volume, follows from it. In India, two families of standards are commonly used to set it: the OISD standards for the petroleum sector, and IS 13039 for other industries.

This guide summarises how each one works. It is a summary, not a replacement for the standard.

What Is Fire Water Demand?

Fire water demand is set by the design fire scenario, not by the equipment. The standard tells the designer which scenario to assume, and the flow, storage, and pressure follow from that choice. Getting this first step right matters more than any later calculation.

Two Families of Standards

  • OISD standards. The Oil Industry Safety Directorate (OISD) formulates and coordinates self-regulatory safety standards, guidelines, and recommended practices for India’s oil and gas sector, from exploration and production to refineries, gas processing, pipelines, and LPG marketing. For fire protection, OISD-STD-116 and OISD-STD-117 are the main references.
  • IS 13039:2014, from the Bureau of Indian Standards, covers external hydrant systems in medium and large scale industrial risks, other than petroleum refining and petrochemical plants, which are governed by OISD standards.

In my work, I see OISD as the backbone of the safety framework for India’s oil and gas sector. IS 13039:2014 is therefore the main Indian reference for hydrant systems in industries outside the direct OISD scope.

OISD-STD-116: Refineries and Processing Plants

OISD-STD-116 covers fire protection facilities for petroleum refineries and oil and gas processing plants. Its design basis is the larger of two demands: fighting two fires at the same time, or a single fire in the worst-case floating roof tank sinking scenario, whichever needs more water.

OISD-STD-117: Depots and Terminals

For petroleum depots, terminals, and pipeline installations, OISD-STD-117 ties the design scenario to the size of the installation:

  • Total tankage up to 30,000 kL: one largest fire contingency
  • Total tankage above 30,000 kL: the two largest fire contingencies at the same time
  • Residual pressure: at least 7 kg/cm² (about 6.9 bar) at the remotest hydrant or monitor
  • Water storage: sized for at least 4 hours of the aggregate pump capacity

IS 13039:2014: Pumping Capacity, Storage, and Pressure

IS 13039 builds the water supply in three steps.

Step 1: Pumping capacity. The capacity of the hydrant pumps comes from the hazard class and the number of hydrant points in the system (clause 5.1.4). For high hazard risks, double-headed hydrants and fixed monitors count as several points each (Table 3, Note 1). Where a water spray, foam, or sprinkler system is tapped from the hydrant service and its demand, including a supplementary hose stream allowance, is higher than the hydrant requirement, the pumping capacity is based on the higher figure.

Step 2: Storage. The static storage reserved exclusively for the hydrant system is set as hours of the aggregate pumping capacity, by hazard class (Table 4):

OccupancyMinimum static storage
Light hazard1 hour, with a minimum of 1,35,000 litres
Ordinary hazard2 hours
High hazard (A)3 hours
High hazard (B)4 hours

Two adjustments apply. For ordinary and high hazard occupancies, storage can be reduced by the quantity of make-up water that a reliable source (other than the town’s main) supplies over 1 hour (ordinary), 90 minutes (high hazard A), or 2 hours (high hazard B), but never below 70 percent of the base requirement. For light hazard buildings whose highest floor is more than 15 m above the surrounding ground, the minimum storage rises to 2,25,000 litres.

Fire water demand: IS 13039 minimum static storage by hazard class

Step 3: Pressure. The system must be designed so that, with half the aggregate pumping capacity discharging at the most remote point and the other half in the most vulnerable area on the way, a running pressure of at least 5.25 kg/cm² is available at the remote point, and water velocity stays below 5 m/s anywhere in the system (clause 7.14).

Illustrative example: a high hazard (B) plant has 60 hydrant points, and the hydrant demand governs. Under IS 13039, this band calls for two pumps of 410 m³/h each, so the aggregate capacity is 820 m³/h. The base storage is 4 × 820 = 3,280 m³. A reliable source supplies 400 m³/h, so a 2-hour inflow credit is 800 m³, which reduces the storage to 2,480 m³. The floor is 70 percent of 3,280 m³, which is 2,296 m³, so 2,480 m³ is acceptable.

Side-by-Side Comparison

OISD (116 and 117)IS 13039:2014
Applies toRefineries, oil and gas processing plants, depots, terminalsMedium and large industrial risks, excluding petroleum refining and petrochemical plants
How demand is setDesign fire scenario (two fires, or the largest tank case; single or two largest fires by tankage)Hydrant points and hazard class; spray, foam, or sprinkler demand if higher
Water storageAt least 4 hours of aggregate pump capacity (OISD-STD-117)1 to 4 hours of aggregate pump capacity, by hazard class
PressureAt least 7 kg/cm² at the remotest point (OISD-STD-117)At least 5.25 kg/cm² running pressure at the remote point (clause 7.14)
ApproachScenario-basedOccupancy and hydrant-count based

Which Standard Applies to Your Plant?

The foreword of IS 13039 notes that Table 23 of the National Building Code governs individual buildings and small scale industries only. In the current NBCS 2026 Part F, the firefighting installations table is Table 7, split by occupancy into Tables 7A to 7J. For other industries, requirements are worked out from the relevant Indian standards in consultation with local fire authorities.

Where a complex has separate plants with different degrees of hazard, IS 13039 does not fix a single rule, and it does not give a distance within which a lower hazard area must be protected to the level of a neighbouring higher hazard area. Its Annex B note leaves the level of protection to be decided with the authority having jurisdiction. The split between areas, and the hazard class used for the shared pumps and storage, should therefore be agreed early with the authority and documented.

From Demand to Pump and Storage

Once the demand is fixed, pump flow and head follow from it. See our guide on Fire Pump Sizing: How to Calculate Power Requirements. Because IS 13039 sets storage in hours of aggregate pump capacity, adding a pump later also raises the storage you need.

Total Storage vs Effective Storage

In my experience, designers often specify a tank from the total fire water demand and then treat the tank’s nominal (gross) capacity as the water available for firefighting. The two are not the same. The Effective storage is always smaller, because some water cannot be drawn: the dead volume at the bottom, the freeboard at the top, the reserve that keeps the pump suction submerged and prevents vortexing, and any draw-off for other services if the tank is shared. IS 13039 itself counts effective capacity only above the low water level, which is at least three times the suction pipe diameter above the draw-off point (clause 6.1), and in a shared tank the general draw-off must sit high enough to leave the required fire water volume untouched (clause 6.5).

Designed on the gross figure, a system looks compliant on paper but runs short of the required duration in a real fire. Good practice is to work backwards: take the required volume (pump capacity multiplied by hours), add the dead storage, freeboard, and reserve allowances, and specify the gross tank size that delivers that net volume. The calculation should be documented, and the fire water reserve kept dedicated.

Finally, effective storage is only useful if the pumps can reach it. Suction arrangements, inlet submergence, and valve and header configurations must allow the water to be drawn. For large reservoirs, IS 13039 requires two interconnected equal compartments (at 2,25,000 litres and above), with pump tappings from both through a common suction header (clauses 6.4 and 6.5).

Common Mistakes

  • Using the wrong standard for the type of facility
  • Counting inflow from a source that is not truly reliable in an emergency
  • Adding pump capacity later without increasing storage to match
  • Designing storage on gross volume instead of effective volume

Key Takeaways

  • Fire water demand comes from the design fire scenario or hazard class defined by the standard
  • OISD standards apply to the petroleum sector; IS 13039 to other industries
  • IS 13039 sets pumping capacity by hydrant points and hazard class, and storage as 1 to 4 hours of that capacity
  • Storage must be sized on effective volume, not the tank’s gross capacity
  • Always check the edition of the standard in force before finalising a design

Conclusion

Fire water demand is the starting point for the whole fire water system. Choosing the right standard, applying its design scenario correctly, and sizing storage on the volume that can really be drawn decides whether the pumps, pipes, and tanks downstream are adequate on the day they are needed.